Document Control Coordinator

ZN Vostok (ZNV) Tehran

Posted 2 months ago

Job Description

  • Ensuring all documents comply with company and industry standards Such as Numbering Procedure, Company Color Code, etc.
  • Using specialized software for document registration and tracking such as 1C, FTP Shared Drive, etc.
  • Collaborating with project teams to ensure timely and accurate document submission.
  • Managing the archiving of project documents and records.
  • Liaising with and distributing project-related information with all levels of the project team and potentially external parties.
  • Handling intake, verification, and storing documents.
  • Checking and editing documents for accuracy and compliance.
  • Distributing project-related copies to internal teams.
  • Controlling the flow of documents in and out of the department.
  • Reporting errors or developments regarding document storage.
  • Designing templates for documents, and file types.
  • Maintaining confidentiality around sensitive information and terms of agreement.
  • Preparing ad-hoc reports on projects as needed.
  • Checking document numbers based on numbering producer and MDR.
  • Preparing and updating the data bank and linking to data addresses to speed up access to them.
  • Controlling the specified deadlines of the reports in and out, following up on them.

Project Coordination:

  • Issuing letters in 1C (ZNV EDMS) for registration and submission to recipients.
  • Taking necessary coordination for meetings with the Client based on approved workflow.
  • Following up on required materials from the contractors.
  • Collecting required evidence for technical discussion via email.
  • Following up on MoMs and collecting representative’s signatures.
  • Asking and collecting required pieces of evidence and justifications for each minute of MoMs from contractors to specify their status.
  • Communication with client representatives regarding the project issues if needed;
  • Preparing and writing MoM in some of the meetings.

Project Control:

  • Maintaining project schedules, and ensuring alignment with project goals and timelines.
  • Holding weekly meetings to monitor the project's progress.
  • Reviewing project schedule to control the presented progress (Plan vs. actual) by contractors.
  • Asking for required evidence of the progress of projects.
  • Analyzing delays reports and asking for remedial action from contractors.
  • Preparing the schedule of some internal projects with MSP Software and updating regularly, such as the CMK Dynamic Model Construction schedule.

To see more jobs that fit your career